ShahfjeHAhahbs1676 ShahfjeHAhahbs1676
  • 25-02-2018
  • History
contestada

The new pipeline opened in 2006 carries caspian sea oil from baki (baku) to a new terminal in the country of

Respuesta :

MsEleanor
MsEleanor MsEleanor
  • 06-03-2018
The BTC Pipeline begins in Baku, the capital city of Azerbaijan, moving through the country of Georgia by the city of Tbilisi, and ends in the city of Ceyhan, a port city in Turkey. This pipeline connects the Caspian Sea to the Mediterranean Sea. 
Answer Link

Otras preguntas

Jamal measured a house and its lot and made a scale drawing. The scale he used was 2 inches : 1 foot. In the drawing, the porch is 30 inches wide. What is the w
Is this angle supplementary or congruent? Please help.
To decrease the likelihood of cultural eutrophication from the effluent released from a water treatment facility, sewage plants may include a a. secondary trea
hello, how is your day today?
what is the product of? (2x - 1)(x + 3)
Simplify 19-4b Thank you
|-9| + |12| = ? options: -3 3 -21 21
The front side of a warehouse is shown in this scale drawing. The width of the warehouse door in the drawing is 2.6 inches. The scale that maps the drawing to
someone finish this story :) at a Chinese restaurant, your character opens his fortune cookie and reads the following message: “ your life is in danger. say no
in the expression 0.2(n+0.35), which best describes (n+0.35)? A. The sum of two terms B. The sum of two coefficients C. The product of two terms D. The product