The terms "threat" and "risk" can be used interchangeably; for example, a "threat assessment" is the same as a "risk assessment."
a. True
b. False

Respuesta :

emma75620
emma75620 emma75620
  • 21-08-2020
I think the answer to this is false
Answer Link

Otras preguntas

Solve for x, 3x - 1 = -7
What makes a food an empty-calorie food?
An ideal gas undergoes two processes: one frictionless and the other not. In both the cases, the gas is initially at 200 ℉ and 1.5 atm, and when the process is
A potential antimicrobial drug is tested and found to strip away the capsules made by certain pathogenic bacteria. How would this drug affect the bacteria's abi
Why was the D-Day invasion such a big deal and why was it so brutal?​
please help im very confused
Which of the following best describes the specific heat of water? O A. It is lower than the specific heat of solids. O B. It is one of the lowest of all substan
Students must mix blue and yellow paint to make different shades of green. The shade of green will be the same if the ratio of blue paint to yellow paint remain
The Fourteenth Amendment was ratified after the Civil War. Yet the first Supreme Court equal protection ruling related to gender was not made until the 1970's i
What is 3x+4+2x+5 the answer