aaliyahgbnl2002
aaliyahgbnl2002 aaliyahgbnl2002
  • 25-03-2020
  • Arts
contestada

What was the role of master builder?

Respuesta :

yusra33khatab
yusra33khatab yusra33khatab
  • 25-03-2020

Answer:

Master builders were responsible for the design, survey, engineering, and management of the construction. In other words, the head builder would be the architect, engineer, and superintendent for each project, Master builder project delivery system and designer construction knowledge

Answer Link

Otras preguntas

why was acquiring Guam important for the United States in the Spanish American war
two southeast asian countries that gained independence in the 1950s are?
Please explain these math questions! 1) How many cm2 in 1m2? 2)How much are 7 pencils at 3 for $1.65 3) Is a hectare roughly equal to 2 tennis courts or 2 socce
Please show me how to solve for Y 4(7y+x)=4
Which is a complete sentence? A. Explore six Pueblo sites in four states. B. Streaked red canyon walls and ancient cliffside dwellings. C. A winding path that l
the running back for the Bulldogs football team carried the ball 9 times for a total loss of 15 3/4 yards. Find the average change in field position on each run
How much is 15% of $25.00
Which describes South Carolinian John C. Calhoun's position on the issue of states rights and the Union? A. States had to obey the federal government's laws. B
changes to the earth that can be explained by plate tectonics include all the following except ___ Earthquakes,erosion,mountain ranges, volcanoes
what is 8.666666666666 in simplest form