kcutler3009 kcutler3009
  • 22-10-2019
  • Business
contestada

The __________ is the fifth of five phases of a project. This is the phase in which the project manager or team confirms the final outcome, conducts a postimplementation meeting to critique the project and personnel, and reassigns project personnel

Respuesta :

Аноним Аноним
  • 31-10-2019

Answer:

Postcompletion Phase

Explanation:

Answer Link

Otras preguntas

Simplify by factoring. Assume that no radicands were formed by raising negative numbers to even powers. two questions below that i need help on[tex] \sqrt{148}
Name and explain two types of prewriting?
what is the set of counting number less than 10?
find (f-g)(x). What is the domain of f/g f(x)=2x-5 g(x)=2-x
if the slope is 26.5° what is the rise per meter
Solve.[tex] \sqrt{x-1}+3=x [/tex]
Help me please stumbling block 1. respectful 2. a mockery 3. abstract 4. an obstruction
Solve the system. x – 2y = 10 3x + 2y = 14 (Points : 5) (–8, 6) (–2, 6) (6, –8) (6, –2)
For all real numbers  x  and  y, if  x # y = x(x-y), then x # (x # y) =My question is, how does x # (x # y) = 8 and how does it also equal to x(squared) - x(cub
What is the equation of the line that passes through the points (-2,2) and (0,5)?