SirBreadCrumbs8322 SirBreadCrumbs8322
  • 25-09-2019
  • English
contestada

The Control Schedule process to ______________ completion of project work in a timely manner.

Respuesta :

ununseptiumaorta
ununseptiumaorta ununseptiumaorta
  • 03-10-2019

Answer:

The Control Schedule process to ensure completion of project work in a timely manner.

Explanation:

In managing the Project Schedule, the finalized and approved schedule represents the implemented basis for the development and direction of the schedule. On the other hand, in the time the project activities take place, most of the effort will also take place in this process to guarantee the fulfillment of the project on time.  

Answer Link

Otras preguntas

give me an atom with the following characteristic? 1.metal 2.metaloid
What is most likely to occur when a calcium supplement and an iron supplement are taken simultaneously
A city that has an elevation of 15 meters is closer to sea level than a city that has an elevation of -10 meters.
wht is joe maa plus a= pls help me i need it
Which of the following is FALSE? A. A midpoint divides a segment into two equal parts. B. An angle bisector divides an angle into two equal parts. C. All right
How many milliliters are in 12.34 liters?
\A thin hoop with a radius of 10 cm and a mass of 3.0 kg is rotating about its center with an angular speed of 3.5 rad/s. What is its kinetic energy
Explain a situation where you restated a sequence of events.
Can you find the perimeter of each rectangle and type the correct code? Please remember to type in ALL CAPS with no spaces. *
l need help with this pls