hayley2146 hayley2146
  • 25-04-2024
  • Business
contestada

In a safety stock problem where both demand and lead time ar variable, demand averages 120 units per year with a month standard deviation of 4 and lead time averages 3 months with variance of months. Considering service level of 97.5% what is safety stock?

Respuesta :

Otras preguntas

the perimeter of a rectangle is 120 meters. If the length of the rectangle is 20 meters more than the width, what are the dimensions of the rectangle.
factor: 6x+36=  how do I solve this problem
Juan is thinking of two numbers. He says that 3 times the first number minus the second number is 118. In addition, two times the first number plus the second n
Find the slope of the ski run that descends 15 feet for every horizontal change of 24 feet
the perimeter of a rectangle is 120 meters. If the length of the rectangle is 20 meters more than the width, what are the dimensions of the rectangle.
factor: 6x+36=  how do I solve this problem
What particles make up the nucleus of an atom?
What are the unit rates for  4/8 , 5/25, 36/6, 14/21, 18/30, 28/16, 56/35, 45/108, 12/42, 39/26
what are some examples of figurative language found in the book Divergent?
what are some examples of figurative language found in the book Divergent?