ness259 ness259
  • 23-04-2024
  • Engineering
contestada

A good overall guideline is that the elements in the BIM model should broken into pieces that closely reflect the likely construction process.
a) True
b) False

Respuesta :

Otras preguntas

QUESTION 3 What are the term limits of Representatives in Congress?
how are glucose molecules used inside a cell
Please help me with this answer please thank you!
a hydraulic pressa has piston of cross sectional area 2.5m² and piston B of cross section area 5m².if a force of 20N is applied at piston A what force is bring
According to the plot, which value is the best estimate of the correlation coefficient of the data?
what you believe was the most important aspect relating to the spear of language
Nadir saves $1 the first day of a month, $2 the second day, $4 the third day, and so on. He continues to double his savings each day. Find the amount that he wi
At first, Mary Magdalene thought the risen Jesus was a gardener. TrueFalse
4. Graph the equation using the slope and y-intercept. y = {x - 4 m = b =
A quadratic function and an exponential function are graphed below. Which graph most likely represents the quadratic function?*PIC*f(x), because an increasing e