destinywyatt98411 destinywyatt98411
  • 26-03-2024
  • Mathematics
contestada

Alpha can do a piece of work in 20 days. beta is 25% more efficient than alpha. The number of days taken by beta to do the same piece of work is
a. 15
b. 16
c. 18
d. 25

Respuesta :

Otras preguntas

Is 4out of 9 more then 2 out of 3 ?
Marriage to multiple partners.
Voices of Modernism (1920s to 1940s) Unit Test Multiple Choice 1. Recall that a participle is a verb form that is used as an adjective. A participial phrase is
Sha'rom most likely comes from which time period and location
The main idea of Lee’s “Letter to His Son” could be expressed best as a. belief that the integrity of the Union must be preserved at all costs. b. determinati
Answer the question in french. Use at least 2 weather expressions in your answer. 1. Quel temps fait-il en hiver a la montagne? 2. Quel temps fait-il en ete a
During your initial research for a thesis paper, you read through various articles on President Harry Truman’s firing of General Douglas MacArthur. One of the a
Which type of muscles can you control voluntarily?
Which of the following was responsible for coordinating the economy during World War I? Selective Service Act War Industries Board Council of National Defens
Enya is building a storage cupboard in the shape of a rectangular prism. The rectangular prism has a square base with side lengths of 2.4 feet and a height of