tsimm6079 tsimm6079
  • 23-01-2024
  • Mathematics
contestada

Rajesh takes 10 days less than the time taken by Manish to finish a piece of work. If they together can finish the work in 12 days, find the time taken by Manish to finish the work.

Respuesta :

Otras preguntas

What is a statement used to communicate one’s feelings in a nonconfrontational manner?
Where are the niagara falls located?
Name 5 fractions that are near 4/12 but not equivalent
how many chromosomes will be left after meiosis
Which of the following was the primary cause of the Balkan Wars conducted during the Clinton administration? A. The rise to power of Slobodan Milosevic in Serbi
What is 4 divided by -10 equal?
KOLBY READ 108 books in one year . if he reads the same number of books each in 5 months?
The ability to smell metal led to which cultural innovation in early civilizations around the world
Which statement about essay format is true? A. The introduction includes the thesis. B. An essay does not require a conclusion. C. An essay always h
Which sentence is written correctly? I wrote a letter (to the mayor) asking for increased funding for our schools. Earning a spot on the football team (which ha