louie4285 louie4285
  • 25-05-2023
  • Business
contestada

An engineering firm recently conducted a study to determine its benefit (B)and cost (C) structure. The results of the study are as follows: B(Y) = 300Y - 6Y² C(Y)=4Y² So that MB = 300 - 12Y and MC = 8Y. You have been asked to determine the maximum level of net benefits and the level of Y that will yield that result.

Respuesta :

Otras preguntas

This is Super Confusing to me
Distinguish between eukaryotic and prokaryotic binary fission.
Explain why 2.15 and -2.15 are are opposites?
if an element has more than one ionic caves how was that piece of information represented in a chemical name?
he percentage of children living in single-parent households in America’s five most populated cities is: Philadelphia 40.4%, New York, 30.5 %, Chicago 32.2%, Ho
A number tripled and tripled again is 729 what is the number
Translate these lines from the poem. "Bot wold ye, lady louely, then leue me grante Nay, for sothe, beau sir, sayd that swete" WOW, I'M LOST!! #ihatemyenglishc
1+4=5 2+5=12 3+6=21 8+11=?
Which of the following is an example of a “smart” exercise choice? Wear extra layers of clothing Swim where a lifeguard can see Prepare large meals beforeha
Which name does the monk who travels to the west not use