robin8794 robin8794
  • 25-05-2023
  • Business
contestada

The safety stock for an item is 150 units, and the lead
time is two weeks. If the lead time changes to three weeks,
calculate the new safety stock.

Respuesta :

Otras preguntas

which of the following countries was the last to industrialize A.) GREAT BRITAIN B.)RUSSIA C.)U.S D.)GERMANY
Do you think that Alexander was worthy of the title “Great”? Explain.
What effect did economic reform have on Slovakia?
Do you think that Alexander was worthy of the title “Great”? Explain.
Explain how Elizabeth I was able to bring a level of religious peace to England.
what is the land like in the south and southwest parts of asia
Which words in the sentence makes up the adverb phrase? Slowy but surely my shoes filled with sand. a. Filled b. My shoes c. With sand d. Slowly but surely
Which of the following is a fragment? a,Often, I go for walks with my dog before anyone else in the house is awake. b,After hours of driving, we finally spotted
Which lines from the poem above illustrate personification? a. “April/Comes like an idiot, babbling and strewing flowers.” b. “Life in itself/Is nothing/An empt
How does John Deere effectively utilize empowerment with its employees?